Dometic PerfectWall Serie Instrucciones De Montaje página 10

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 41
Installing the awning
Installing awning on the piping rail
➤ Select the location of the installation.
In particular, check that there is enough space in the interior to mount the counter
plates at the points where the screws will be.
I
NOTE
Measure the recommended mounting position for each counter plate
against the drill hole in the lower section of the awning.
➤ Use two people to hook the awning on to the piping rail.
➤ Extend the awning about 50 cm using the crank.
➤ Mark where the holes are to be drilled (fig. h, page 2).
➤ Retract the awning completely using the crank.
➤ Use two people to lift the awning from the piping rail.
➤ At the marked points, drill holes with a diameter of 6.5 mm from the outside
through the external wall.
➤ Fill the drill holes in the vehicle wall with an acid-free silicone.
➤ Use two people to hook the awning on to the piping rail.
➤ Extend the awning about 50 cm using the crank.
➤ Fasten the awning using a countersunk bolt, counter plate, serrated lock washer
and hexagon nut (fig. i, page 2).
➤ Insert the cover caps on the counter plates (fig. e, page 2).
➤ Retract the awning completely using the crank.
Installing the mounting bracket
The mounting bracket must be installed if the awning is to be attached to the side of
the vehicle when extended.
➤ Select the location of the installation.
➤ Mark where the holes are to be drilled.
➤ At the marked points, drill holes with a diameter of 3 mm from the outside into
the external wall (fig. j, page 2).
➤ Put the upper and lower sections of the mounting bracket together.
10
PerfectWall
EN

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Perfectwall pw 1000Perfectwall pw 1500Perfectwall pw 1750

Tabla de contenido