ENGLISH
7.2
TEA MEASURE
PROGRAMMING
(HOT WATER)
It is possible to modify the timed tea measures
according to the following sequence:
Press key T5 of coffee unit 1 and keep pressed
down for over 5 seconds and check that all the
keyboard led indicators come on.
Press the T6 tea key within 30 seconds (pro-
gramming time-out).
This begins the tea water delivery operation.
Once the required measure is obtained press
T6 again to suspend water delivery. In this way
the new tea water delivery time is memory and
all the keyboard leds go out.
Press key T5 again to immediately escape from
the programming phase.
T5
T6
34