Ferroli FORCE B Instrucciones De Uso, Instalación Y Mantenimiento página 161

Ocultar thumbs Ver también para FORCE B:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

FORCE B
check of circulating pump operation, freeing them when necessary
fume analysis and check of combustion parameters
The boiler casing, control panel and aesthetic parts can be cleaned with a damp, soft cloth, if necessary
A
soaked in soapy water. Do not use abrasive detergents and solvents.
Opening the front panel
B
Some internal components of the boiler can reach high temperatures able to
cause severe burns.Before carrying out any operation, allow these compo-
nents to cool or, alternatively, wear appropriate gloves.
To open the boiler casing:
1. Undo the screws A (see fig. 64).
2. Pull the panel B.
Proceed in reverse order to refit the front panel. Make sure it is correctly hooked to the upper fastenings and is correctly
positioned at the sides.
EN
A
B
A
fig. 64- Front panel opening
cod. 3541T170 - Rev. 00 - 09/2019
A
A
161

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido