A P P L I C A T I O N
4.3
Preparing the milling machine
When the milling machine is set up for dry
E N
processing:
▷ Convert the milling machine for wet processing
(see Operating Instructions).
▷ Disengage lever [3] and pull off the splash guard
[1] toward the front.
1
Fig. 5
Five-axis model
1
Fig. 6
Four-axis model
Legend to figure 5 and figure 6:
1 Splash guard
2 Blank holder
3 Lever
A Operation button
12
2
3
A
2
3
A
To remove the blank holder:
▷ With the door closed, press operation button [A]
for at least three seconds.
The current tool is placed down and the blank
holder [2] returns to the change position.
1
Fig. 7
Five-axis model
1
2
Fig. 8
Four-axis model
Legend to figure 7 and figure 8:
1 Fastening screw for blank holder
2 Blank holder
▷ Loosen fastening screw [1].
▷ Pull off the blank holder toward the right (five-
axis model) resp. toward the bottom (four-axis
model).
▷ Clean the locating bore and surfaces.
2