Red Sea MAX C-Series
4. Insert the accessory pipe unit into the window in the hinge bracket
and click it into position. Make sure that pump cables are positioned
in the recess provided on the sides of the pipe unit.
5. Push the hose barb of the pump into one of the connectors and screw
the lock nut to hold it in position.
6. Connect the required length of 17mm (¾") flexible pipe to the other
hose barb. Insert the free end of this pipe into the sump as shown
and connect the bayonet to the other connector on the pipe unit.
7. When first operating the chiller pump, check that the water is
circulating through the chiller without leaks at any of the connections
in the piping.
8. If connecting the chiller to an operating system pay attention to the
drop in water level and refill the tank with freshly mixed salt water at
the same salinity, pH and temp.
16
8 Installation of Lighting Hood
Using the protective packaging from the top of the box as a cushion,
place the hood upside down on a level surface.
1. Remove the plastic screws from the transparent lens and open the
light tube compartment.
2. Insert all of the light tubes, rotating them through 90 degrees until
they are seated correctly in the lamp holders.
3. Replace the lens, ensuring that the gasket around its inner edge is
properly positioned and secure in place with the plastic lens screws
cover. Remove the protective film from the lens.
4. The hood is now ready to be placed on the aquarium.
NOTE: After initial assembly, replacing the light tubes can be performed
with the hood attached to the aquarium
5. Check that the hood support is set in position as shown in the
diagram.
6. Feed both the hood power cable and the fan cable out of the opening
in the right hinge bracket and place
the hood on top of the aquarium.
Hood supports
Skimmer - flap open