3. Operating instructions
A.
Handle
B.
Oil injector
C.
Release valve
D.
Pressure gauge
Preparations before use
•
Read the safety recommendations before
starting any work
•
Inspect all components for damage.
Pay particular attention to high pressure pipes.
Damaged high pressure pipes must not be used
and should be discarded
•
For mounting operations it is recommended
to use oil with a viscosity of approximately
300 mm
/s (1 400 SUS) at the operating
2
temperature.
For dismounting operations, its is recommended
to use oil with a viscosity of approximately
900 mm
/s (4 100 SUS) at the operating
2
temperature.
•
Use only clean oil. Dirty oil can permanently
damage the internal workings of the unit
(† see 4.4).
•
Fill the oil reservoir. Immerse the end in a
container of clean oil. Pull the handle to suck
the oil into the reservoir.
A
H
G
E.
Gauge nipple
F.
High pressure pipe (not shown)
G.
Oil reservoir
H.
Stand
•
Turn the reservoir upside-down and push on
the ball to remove any air from the reservoir.
D
C
E
B
EN
5