Putting The Prcd Switch Into Operation; Function Of The Unit; Overview (A); Commissioning - Rothenberger RODRUM S Instrucciones De Uso

Ocultar thumbs Ver también para RODRUM S:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 30
Once the red function display has lit up, the device is ready to operate. Whenever it is un-
plugged, or the power fails, the device automatically shuts off.
Operational test: Press the blue "TEST" button: The device shuts off. Press the "RESET" button:
Once the red operation display has lit up, the device is ready to operate.
Always perform the operational test before starting up the device. If there is a repeated failure,
have the connected device inspected.
Please keep in mind that this device cannot replace fundamental safety precautions. To prevent
life-threatening hazards, be sure to use electrical devices only as intended.
Reliable personal protection against electric shock. Fault currents are recognized in a fraction of
a second, and the current supply is immediately interrupted. The risk to humans and animals is
drastically reduced.
- Never use the electric tool without a PRCD.
- The plug or electrical cord should be replaced only by the manufacturer of the electric tool or
by its repair service.
- Keep water away from electrical parts of the electric tool and from people in the work area.
5.1

Putting the PRCD switch into operation

Only suitable for AC current! Note the mains network voltage!
Perform the following test procedure on the PRCD switch before every putting into operation of
the device:
1. Connect the PRCD plug connector with the socket.
2. Press on RESET. The indicator switches to RED (ON).
3. Pull the plug connector out of the socket. The display switches itself off.
4. Repeat 1. and 2.
5. Press on TEST. The red indicator switches itself off.
6. Press on RESET to switch the device on (RED).
These protective device protect against faults in the attached device, not against such
faults in the preceding plant.
6

Function of the Unit

6.1
Overview
1
Drum
2
Motor
3
Network cable with PRCD
4
Foot switch
5
Feed unit handle
6.2

Commissioning

The pipe cleaning machine should exclusively be operated by instructed and
authorised personnel!
 Check the electrical installation at the work place
 Place the foot switch in such a way that it can be easily reached and that all control ele-
ments are easy to operate.
 Connect the mains power plug to the appropriate power supply network.
Ensure that the motor switch is set to "OFF"!
6
Feed unit
7
Drainage plug
8
Guide tube
9
Clamping grip
10
Motor switch
ENGLISH
(A)
15

Publicidad

Tabla de contenido
loading

Tabla de contenido