bora PL 540 Manual De Instrucciones página 19

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 57
Installation of the control box
Use the delivered drill template to carry out the panel
bore on the control box. Position the drill template in
the centre of the extractor unit, mark the drill hole
positions and drill the hole for the control box.
Establish the electrical connection in the floor unit
before the control box is installed and fitted.
Use the accompanying compensation plates to
achieve a total panel thickness of 36 mm, i.e. panel
thickness and compensation plates taken together are
36 mm thick. The total thickness of 36 mm must be
adhered to in order to ensure proper functioning of the
control
box.
The
following
compensation plates have to be used with which panel
thicknesses:
19
GB
table
shows
which

Publicidad

Tabla de contenido
loading

Tabla de contenido