Faber VEIL Manual De Instrucciones página 18

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 32
INSTALLATION
Draw the following on the Wall:
• a Vertical line up to the ceiling or top surface, at the centre of the area in which the Hood is
to be fitted;
• a Horizontal line: 650 mm min. above the Hob;
• As shown in the drawing, mark a reference point 455 mm above the reference horizontal
line, and at a distance of 240 mm to the right of the vertical reference line.
• Repeat this operation on the other side, checking to ensure it is level.
• Drill the points marked using a ø 12 mm drill bit.
• Insert the wall plugs with screw and bracket 11a into the holes, tighten.
• As shown in the drawing, mark a reference point 75 mm above the reference horizontal line,
and at a distance of 200 mm to the right of the vertical reference line.
• Repeat this operation on the other side, checking to ensure it is level.
• Drill the points marked using a ø 8 mm drill bit.
• Insert the plugs 11 into the holes.
• Rest the Bracket 7.2.1 as indicated, 1-2 mm from the ceiling or surface above the hood, aligning
its centre (grooves) with the vertical reference line.
• Mark the centres of the holes in the bracket.
• Rest the Bracket 7.2.1 as indicated, X mm under the first bracket (X = height of the Upper
chimney provided), aligning its centre (grooves) with the vertical reference line.
• Mark the centres of the holes in the bracket.
• Drill the points marked using a ø 8 mm drill bit.
• Insert the plugs 11 into the holes.
• Fix the brackets using the screws 12a (4.2 x 44.4 ) provided.
EN
Drilling the Wall and Fixing the Brackets
240 240
200 200
1
18

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Veil-col

Tabla de contenido