Chapter 3 - Start-Up; On Receiving The Tool; Installation - Desoutter EAP1.5-15 Serie Manual Del Operador

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 41
Part no
6159936431
Issue no
06
Language English
Date
09/2009
24
Page
8 /

1 - ON RECEIVING THE TOOL

Check that the following items are included in the kit supplied with the tool:
the certificate of conformity,
the safety instructions,
the CDROM,
the operator's manual.
On delivery, a separate kit can be provided according to the country of destination. The kit includes the following items:
the mains cord.

2 - INSTALLATION

Install the necessary accessories:
rotating suspension device
double safety device
...
Make sure that the operating voltage specified on the tool corresponds to the voltage of the electric network.
Make sure that the protection devices of the line are appropriate to the tool and that the safety instructions are respected.
The Standard and Advance tools are directly connected to the mains. No other connection is required.
Advance tools connected to the Data Transfer Unit controller have the same functions as the Data Transfer Unit. See correspond-
ing documents.
Switch the tool on:
To switch the tool on, you must make the electric connections in the following order:
connect the mains cord to the tool,
then connect the mains plug to the electric network.
The tool connector must never be connected or disconnected when the tool is on.
Adjust the tool:
enter the access code,
set the torque,
carry out the learning sequence directly on the assembly,
check and validate the adjustment (see "PROGRAMMING," page 9).
The tool is ready to operate.
This is the easier and the faster method; however the tool can be programmed from a PDA.
The factory access code is 122.

CHAPTER 3 - START-UP

www.desouttertools.com
EAP 1.5 - 15 - T 2
EAP/EDP

Publicidad

Tabla de contenido
loading

Tabla de contenido