Shut-Down; Changing The Spiral Drum (F); Extending The Operating Area (A) - Rothenberger RODRUM M Serie Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 37
The spiral should never be fully moved back out of the drum!
The change in direction of rotation (switch position II) may only be performed for a short
time in order to loosen a blocked tool.
6.8

Shut-down

 Switch off the machine through actuation of the motor switch and pull out the mains power
plug.
 Remove the guide tube from the device.
 To empty water out of the spiral drum, position the drum with the openings downwards; if
necessary clean with a water hose.
6.9
Changing the spiral drum
Only change the spiral drum when the device is completely deenergized!
 Place the pipe cleaning machine securely in a level, stable state.
 Release the clamping grip (and push the feed unit to the front. In doing so fix the drum by
hand on the frame.
 Pull the spiral drum to the front in the axial direction and remove.
Due to the weight grip, grip the spiral drum with both hands and avoid any
possible falling down on the feet.
 Push new spiral drum in an axial direction all the way onto the axis in the frame.
 Push the feed unit back again and fix in place with the clamping grip.
Ensure that the lever is closed with a sufficiently high force and stands at the end, as far
as possible, horizontally.
The clamping grip is fitted with a setting thread in order to set the direction of the tension-
ing lever. A red point on the thread shows when the thread has too little overlap. For
tensioning the knurled nut must be adjusted in such a way that the red point is covered
otherwise the thread can be damaged.Ensure that all parts are free of dirt and are ade-
quately greased!
Check correct seating of the feed unit!
6.10
Extending the operating area
 Fully move the spirals into the pipe.
 Decouple the spirals at the lower end from the connecting piece.
 Fasten the spirals to the suitable coupling at the front on the frame.
On the left:
20 mm square coupling
 According to 6.9, exchange the empty spiral drum against a drum which is fitted with the
same spirals.
 Decouple the spirals from the frame and connect these with the spirals in the spiral drum.
 To stow the spirals proceed in the reverse sequence.
ENGLISH
(F)
(A)
On the right:
16 mm T-groove cou-
pling for 13 mm –
16 mm spirals
19

Publicidad

Tabla de contenido
loading

Tabla de contenido