14
ASSEMBLY
14.1
Preparatory activities
14.1.1 Delivery content
Please check the product contents immediately after receipt for any eventual transport damage or
missing parts. Claims from transport damage or missing parts must be placed immediately after
initial machine receipt and unpacking before putting the machine into operation. Please understand
that later claims cannot be accepted anymore.
14.1.2 Workplace requirements
The workplace has to fulfill the requirements.
The ground has to be even, in level and hard. It must be suitable at least to weight it with double
weight per square meter than the machines net weight.
The chosen workplace must have access to a suitable electric supply net hat complies with the
machines requirements.
14.1.3 Preparation of the surface
Uncoated metal machine parts have been insulated with a greasy layer to inhibit corrosion.
This layer has to be removed. You can use standard solvents that do not damage the machine surface.
Do not use solvents based on nitrite, aggressive solvents like break
cleaners or scrubbing agents!
These damage the machine surface.
14.2
Assembly
The machine is delivered pre-assembled.
For transport reasons some parts of the machine can be assembled by the customer.
14.2.1 Lock lever
This lever has to be mount at the headstock and the tool rest.
The shoulder screw (1) passes through the spring (2) and the
handle lever (3). If either lock lever has come loose from the
lathe or has come apart in shipping, reassemble it and thread
into place.
To operate, push the handle lever in and turn clockwise to
tighten. Pulling the handle lever outward will disengage the
threaded shaft, allowing you to reposition the lever handle so it is
out of the way.
HOLZMANN MASCHINEN GmbH
www.holzmann-maschinen.at
N O T I C E
ASSEMBLY
26
D 300F