Maintenance Schedule - Parkside PGI 1200 A1 Instrucciones De Servicio Y Seguridad

Generador del inversor
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

14.

Maintenance schedule

Please adhere to the following maintenance periods in order to ensure a failure-free operation.
IMPORTANT! The equipment must be filled with engine oil and fuel before it is started.
Before each use
Checking the engine oil
Changing the engine oil
Checking the air filter
Cleaning the air filter
Cleaning the petrol filter
Visual inspection of the
equipment
Cleaning the spark plug
Checking andreadjus-
ting the throttle vale on
the carburetor
Cleaning the cylinder
head
Set the valve play
Important: The positions marked with "x*" should only be carried out by an authorized dealer.
44
GB
After an operating
period of 20 hours
X
For the first time,
then every 50
hours
X
X
After an ope-
After an opera-
rating period of
ting period of 100
50 hours
hours
X
X
X
Distance: 0.6
mm, replace if
necessary
After an
operating
period of
300 hours
Change the
filter insert if
necessary
X*
X*
X*

Publicidad

Tabla de contenido
loading

Tabla de contenido