Maytag MBL2256KES Guía De Uso Y Cuidado página 11

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
5. Slide brass nut over sleeve and screw
nut into inlet port.
Place adjustable wrench on nut
(1) attached to plastic waterline
and maintain position.
Using second adjustable wrench
turn the lower nut (2)
counterclockwise
and fully
tighten while holding the upper
nut in place.
Important:
Do not over-tighten.
Cross-threading
may occur.
Pull on tubing to confirm
connection
is secure.
Connect tubing to frame
with water tubing clamp (C)
and turn on water supply.
Check for leaks and correct
if necessary. Continue to
observe the water supply
connection
for two to three
hours prior to moving the
refrigerator
to its permanent
location.
7. Monitor water connection
for 24 hours. Correct
leaks, if necessary.
Alternate
connection
(select models)
Materials
Needed:
• '/4" outer diameter flexible copper tubing
• Shut-off valve (requires a '/4" hole to be drilled into
water supply line before valve attachment)
• Adjustable
wrench
• '//' hex nut driver
Notes:
• Use copper tubing only for installation.
Plastic is
less durable and can cause damage.
• Add 8' to tubing
length needed to reach water
supply for creation of service loop.
2. Remove plastic cap from water
valve inlet port.
Place brass nut (A) and sleeve (B)
on copper tube end as illustrated.
Reminder:
Do not use old sleeve.
The nut and the sleeve are
provided
in the use and care
A
packet.
Place end of copper
tubing into water valve
inlet port. Shape tubing
slightly. Do not kink -
so that tubing
feeds straight
into inlet
port.
5. Slide brass nut over sleeve and screw nut
into inlet port. Tighten nut with wrench.
Important:
Do not over-tighten.
Cross
threading
may occur.
Pull on tubing to confirm connection
is
@
secure. Connect tubing to frame with
....
water tubing clamp (C) and turn on
E
water supply. Check for leaks and correct
if necessary. Continue to observe the
i
water supply connection
for two to three
hours prior to moving the refrigerator
to its permanent
location.
7. Monitor water connection
for 24 hours.
Correct leaks, if necessary.
1. Create service loop with copper
tubing
(minimum
2' diameter).
Avoid kinks in the copper tubing
when bending the service loop.
Do not use plastic tubing.
2' diameter
10

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Mbf2556keqMbl1952kesMbr2562kesMbr2556kes

Tabla de contenido