Place the chlorine cell in a vertical position with electrical connections wired
upwards. If this is not possible, it can be assembled in a horizontal position,
ensuring that the small auxiliary electrode faces upwards.
•
Place the chlorination cell in the highest position possible of the purification
circuit and always after the filter or any other element of the water circuit
(probes, flow switch, ...) .
•
If it is possible, we recommend to install the cell with a by-pass system and
its corresponding shut-off valves. This will facilitate maintenance of the cell.
•
Do not place the REDOX probe (OPTIONAL) near the chlorinator cell, faulty
readings could be found due to the proximity of the electrolysis circuit.
Always ensure there is at least half a meter of water flow circuit between
the probe and the chlorination cell.
The REDOX probe should be installed after the filter, but if with this layout it
is not possible, it must keep a minimum distance from the cell, so it can be
assembled before the filter. In this case, the maintenance will be more
often(see paragraph 6.2 below in "Maintenance").
•
A good earth connection is essential. Use a 30mA (max of sensitivity)
differential relay.
If a good quality earth connection is not available, place an earth
connection kit between the electrolysis cell and the redox probe.