DINAMIC 1.1
EN
Position the cover with the previously
16
dismounted screws.
Position adapter protection cover with metal
17
threaded screws 3.1x 11 on the side opposite
the pipes.
GAS LOAD:
Empty the circuit for at least 30 minutes.
18
Introduce 300 g of gas load R134a and start
19
up the equipment.
GENERAL VIEW OF THE CONDENSATION
20
UNIT AND PIPING.
17
20
30
®