3. Remove the stabilizer jack locking
pin (D, Figure 7). Rotate the jack into
the operating position (E). Install the
stabilizer jack locking pin fully through
the top and bottom holes in the jack
and outrigger.
4. Unfold the handle (F, Figure 7) of the
stabilizer jack. Turn the handle coun-
ter-clockwise to lower the jack foot
(G) firmly onto the work site surface.
C
B
A
Figure 7
5. Repeat for the remaining outriggers
and stabilizer jacks.
6. Level the portable light tower front to
back and side to side with the jacks,
using the level as a guide.
To stow the jacks and outriggers:
1. Make sure that the lights are shut
down and the light tower mast is
completely lowered.
WARNING
Tipover Hazard
Failure to lower the light tower mast
before stowing the outriggers could
cause the light tower to tip over, result-
ing in death or serious injury. Always
lower the light tower mast before stow-
ing the outriggers.
2 Fully raise the stabilizer jack foot by
turning the jack handle clockwise.
3. Fold the handle.
4. Remove the stabilizer jack locking
pin, rotate the jack into the transport
F
D
E
G
position, and install the stabilizer jack
locking pin fully through the top and
bottom holes in the jack and outrig-
ger.
5. Remove the hair pin cotter and outrig-
ger locking pin. Raise the outrigger
into the transport position, and lock in
the transport position with the outrig-
ger locking pin. Secure with the hair
pin cotter.
6. Repeat for the remaining stabilizer
jacks and outriggers.
Preparing To Operate The Unit
Follow these steps to prepare the por-
table light tower for operation:
1. Level the portable light tower. See
Leveling And Stabilizing The
Portable Light Tower.
2. Connect a heavy-duty, exterior-use
power cord (A, Figure 8) from the
power inlet on the side of the unit (B)
to a 120-volt AC power source. See
Specifications.
NOTE: Route the cord through the
access hole in the base (C).
B
A
Figure 8
C
en
13