Installation - HSM 411.2 Instrucciones De Servicio

Ocultar thumbs Ver también para 411.2:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 51

8. Installation

• Compare power source with data on name plate before inserting the mains plug.
• Install the paper shredder so that the mains plug is easily accessible.
• Paper shredder must only be operated in upright position.
• Set up paper shredder so that the ventilation slots are free.
• To ensure sufficient ventilation of the shredder, a clearance of at least 10 cm must
be maintained from walls or any furniture.
• The shredder's overload and short circuit protection depends on the protective
system installed in the mains supply (the building's electrical system).
Inserting the bag for shredded material
1
• Open front door and pull out frame with bag for shredded material.
• Fold new bag around frame and allow to overlap by approx. 20 cm.
• Push frame with guide and bag into bottom frame.
• Close front door.
01/02
Paper shredder
Undo the wing screws securing the unit
during transportation
On machines with cross cutting the two red
ties of the transport retainer for the
compacting unit must be removed.
2
GB
HSM 411.2
3
21

Publicidad

Tabla de contenido
loading

Tabla de contenido