3. Before you start...
Unpacking
Remove the packaging and place the scale on a firm, level surface.
The scope of supply includes:
• Weighing platform with folding handrail
• Display head plus connecting cable
• 3 Screws
• 1 seca mains unit
• 1 set of operating instructions plus
declaration of conformity
Fitting the display
– Carefully put down the scale.
– Release the latch and lift up the hand-
rail. Retain it in this position so that it
cannot drop back down.
– Screw up the two locking bolts. Ensure
that the handrail is rigid and has no play.
Model 676
Latch
Locking
bolts
17
GB