Transport And Storage; Installation Of Energy Meter (Fig. I) - Diehl Sharky 774 Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

English
Detailed user guide available at https://www.diehl.com/metering/en/
support-center/download-center/.
The Software IZAR@Mobile2 is used for reading out data and configuration
and can be downloaded from the Internet under:
https://www.diehl.com/metering/en/support-center/download-center/
Changing of communication relevant parameters can result in
the loss of OMS certification.
2.

Transport and storage

Unpacking
Energy meters are measuring devices and must be handled with care. To
protect against damage and soiling, they should only be unpacked imme-
diately prior to installation.
Transport
The transport of the meter is permitted only in the original package.
When sending wireless measuring instruments / components by
air, disable the wireless (place in aircraft mode) before shipping.
3.

Installation of energy meter (fig. I)

ƒ
Depending on the design and application (heat or cooling meter), the
energy meter is installed in either the hot or cold line of the system.
ƒ
The flow sensor must be installed so that the flow direction matches
the arrow direction on the sensor.
ƒ
Depending on the version, the flow sensor must be installed in inlet or
outlet. The installation position is displayed in the info loop 3.4 (see
"Information loop (3)" on page 25) and, if necessary, also by means
of a pictogram.
-17-

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido