Installation Procedure - cascade corporation 35A Manual Del Usuario

Desplazador lateral integrado
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 52
I
NSTALLATION

Installation Procedure

IMPORTANT: Integral attachment installation is an OEM or
dealer responsibility. Some of the following steps may or may
not be required, but are shown for reference. Refer to the
appropriate service manual for service and repair procedures.
1
Integral Sideshifter carriage should
be installed in mast per OEM
specifications and procedures.
2
Flush supply hoses
3
Connect hoses and solenoid wiring
6812836 EN
Sideshift Right/
Unlock Pins
Solenoid
Coil
Union Fitting
7.5 Amp Fuse
Sideshift Left/
Lock Pins
SS0947.eps
GA0171.eps
Control Switch
18 gauge wire
Valve
Solenoid Coil
SS1006.eps
6

Publicidad

Tabla de contenido
loading

Tabla de contenido