Assembly Instructions For 24 V Dc Electrics - Franke AQRE 432 Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 21
Important!
• Carefully tighten the solenoid valve cartridge.
• Keep the flush-plugs in the flush-mounting cabinet to enable removal of the
solenoid valve cartridge at a later date.
11.7 Close the flow volume regulator (c) with a screwdriver, 8 mm head width.
Screw the flow volume regulator up to the stop limit.
Important!
Do not remove the circlip.
11.8 Remove the mounting frame from the cover plate by loosening the set screw.
5526 12 24-F (24 V DC)
11.9 Remove the protective earth conductor cable (f).
5526 11 24-F (230 V AC)
11.10 Fasten the protective earth conductor cable (I) to the mounting frame (m).
g Nut
h Tooth washer
j Cable lug
k Pin
11.11 Screw the mounting frame (m) on horizontally. The pin must face inwards.

12. Assembly Instructions for 24 V DC Electrics

12.1 Loosen screw (a) and remove the cover (b) of the connector terminal.
12.2 Connect the 2 x 1.5 mm² cable (c).
12.3 Plug the two connector terminals together.
12.4 Attach the connector terminals to the snap-fit fastener (simplified representation).
12.5 Connect the control unit and the connection terminal with the coupling.
12.6 Connect the control unit with the solenoid valve cartridge.
12.7 Adjust the flush-volume (see
12.8 Adjust the flush flow-rate (see
12.9 Place the cover plate (d) on the frame and hang it behind the flap on the mounting
frame.
12.10 Attach the cover plate with a set screw.
Chapter
15.).
Chapter
16.).
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Aqre 43376129821022647612982102257

Tabla de contenido