Electrical Diagram - Riello BGK1 Instrucciones De Instalación, Uso Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6.5

Electrical diagram

KEY TO LAY-OUT:
B5
2nd stage operation signal (230V
C
Capacitor
E
Electrode
F
Flame sensor
h..
– Hour counter (230V
K
– Thermostat enabling start-up after
preheating
PH – Oil heater
MV
Motor
RS
Remote reset
S3
Remote lockout signal (230V
SER
Safety lockout device
T6A
Fuse
TB
Burner earth
TL
Limit thermostat
TS
Safety thermostat
V1
Oil valve 1st stage
V2 – Safety lockout device
X..
– Plug
XP.. – Socket
Start-up, calibration and operation of the burner
20139658
Master
switch
230V ~ 50Hz
~
- 0.1A max.)
~
- 0.1A max.)
~
- 0.5A max.)
TO BE DONE BY
BY THE INSTALLER
 Do not invert the neutral with the phase in the
electrical supply line.
 Check that the electrical supply of the burner
corresponds to that shown on the identifica-
WARNING
tion label and in this manual.
 The section of the conductors must be at
least 1mm
local standards and legislation).
Test the burner by checking the shut-down of the
burner by opening the thermostats and the lockout
by blocking out the flame sensor.
WARNING
If the cover is still on, remove it and proceed with
the electric wiring following the wiring diagrams.
Use flexible cables in compliance with EN 60 335-
CAUTION
1 standards.
23
GB
2
. (Unless requested otherwise by
Fig. 22
20136520

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Bgk2Bgk337370063737066373745620012189

Tabla de contenido