Electrical Wiring; Important - Riello 40 FS5D Instrucciones De Instalación, Uso Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ELECTRICAL WIRING

~ 50Hz 230V
PE
L
N
Main switch
T6A
TS
TL
X P7
L1
N
T1
T2
S3
B4
TB
E
KEY TO LAY-OUT
AD – Air damper opening motor
C
– Motor capacitor
CN1 – Ionising probe connector
E
– Ignition electrode
st
h1
– 1
stage hour counter (230V - 0.1A max.)
nd
h1
– 2
stage hour counter (230V - 0.1A max.)
MV – Fan motor
PA
– Air pressure switch
PG – Minimum gas pressure switch
RS
– Remote reset connection
SB
– Remote lock-out signal
(230V - 0.5 A max.)
SM – Air damper servomotor
3312
WARNING:
Do not swap neutral and phase over, follow the diagram shown carefully
and carry out a good earth connection.
The section of the conductors must be at least 1mm².
(Unless requested otherwise by local standards and legislation).
The electrical wiring carried out by the installer must be in compliance with the
rules in force in the country.
SB
h1
h2
SO
B5 T 6 T 7 T 8
CN1
PA
MV
M
C
SM
R S
TB
Ph
N
1
2
3
X P6
1
2
VS
V1
PG
P
P
SO – Ionisation probe
TB
– Burner earth
TL
– Limit thermostat
TS
– Safety thermostat
nd
TR
– 2
T6A – Fuse
st
V1
– 1
stage valve
nd
V2
– 2
VS
– Safety valve
XP
– 4 pin plug/socket
XP
– 6 pin plug/socket
XP7 – 7 pin plug/socket

IMPORTANT

The burners have been approved for intermittent
operation. This means that they must stop once
every twenty four hours to permit the electrical
control box to check its efficiency at start up. Nor-
T R
mally the boiler's limit thermostat (TL) ensures
the stopping of the burner.
If this is not the case, it is necessary to apply in
series with the (TL) a timer switch that turns off
X P4
the burner at least once every twenty-four hours.
TESTING
Check the burner has stopped by opening the
thermostats.
Check that the burner has locked out during
operation by opening the connector (CN1) in-
serted in the probe's red wire, located outside
the control box.
CONTROL BOX, (see fig. 2)
To extract the control box from the burner it is
necessary:
to disconnect all the connectors connected to
it, the 7 pin plug, and the earth wire (TB);
undo the screw (A) and pull out the control box
in the direction of the arrow.
AD
For the installation of the control box it is neces-
sary:
M
to tighten up the screw (A) with a tightening
torque of 1 - 1.2 Nm;
connect all the connectors that were previously
D7363
connected.
Fig. 2
V2
A
stage thermostat
stage valve
5
GB
E9324

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

587 m37587043758705

Tabla de contenido