Commissioning; Place Of Installation - IKA Heizung C 1.20 Instrucciones De Manejo

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 27

• Place of installation:

Set up the device in a spacious area on an even, stable, clean,
non-slip, dry and fireproof surface.
The installation area must be large and well-ventilated enough to
ensure that the heat given off by the device does not overheat
the room. There should be 10-15 cm of clearance on the front
and back sides.
• Installation:
Remove the C 1.20 heater from the packaging.
 Remove the water inlet hose on the C 1.
 Set the C 1.20 heater behind the C 1 on a level, stable surface.

Commissioning

• Connecting the water hose
 Connect the C 1 water inlet hose to the C 1.20 heater as follows
(IN).
Preparing the C 1 inflow pipe for the C 1.20 heater
C 1 water inlet hose
- Separate the C 1 water inlet hose using the supplied "Handle"
tool into part A (IN C 1.20) and Part B (OUT C 1.20).
Fig. 7
Hose section A
- Attach hose connector C from the supplied hose connector set
to the filter from Part A.
Hose section A
- Attach hose connector D from the supplied hose connector
set to Part B.
Fig. 8
Hose connector D
- This results in
Part X (IN C 1.20)
"Handle" tool
Fig. 9
Hose section B
Fig. 10
Hose connector C
Fig. 11
Hose section B
Fig. 12
Part Y (OUT C 1.20)
Fig. 13
14

Publicidad

Tabla de contenido
loading

Tabla de contenido