Handling And Installation; Packaging And Unpacking - Angelo Po 1G1PE1E Manual De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

HANDLING AND INSTALLATION

RECOMMENDATIONS FOR HANDLING AND INSTALLATION
Important
When handling and installing the appliance
comply with the information provided by
the constructor directly on the packaging,
on the appliance and in the instructions for

PACKAGING AND UNPACKING

The packaging is designed to reduce space and as
appropriate to the type of transport used.
To simplify transport, some components may be re-
moved and suitably protected and packed for trans-
port.
The packaging carries all information neces-
sary for loading and unloading.
When unpacking, check that all components
are present in the correct quantities and are
undamaged.
The packaging material must be properly disposed
of in accordance with legal requirements.
IT
GB
TRANSPORT
Different means of transport may be used, depend-
DE
ing partly on the destination.
The chart shows the most commonly used alterna-
FR
tives.
During transport, fix the packaging to the means of
ES
transport securely to prevent undesirable shifting.
English
use. If necessary, the person authorised to
carry out these operations must organise a
"safety plan" to protect the people directly
involved.
- 14 -
IDM-39603609700.tif
Lifting
equipment
Means of transport
IDM-3960200180.tif
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

1g1pe2e2g1pe1e2g1pe2e

Tabla de contenido