Descargar Imprimir esta página

GE GTH21 Manual Del Propietário página 16

Ocultar thumbs Ver también para GTH21:

Publicidad

Idiomas disponibles

Idiomas disponibles

WATER VALVE ASSEMBLY INSTALLATION INSTRUCTIONS (cont.)
ROUTE AND ATTACH THE WATER
5
TUBE
Fasten the plastic water tube to the back of the
refrigerator with adhesive-backed fasteners (4),
spacing the fasteners as shown to take up slack in
the tube.
temperature control
(refrigerator) only.
6
WATER VALVE INSTALLED
Refer to the Water Line Installation Instructions for
connection to the home water supply. After water line
installation is completed, set the feeler arm to ON.
The icemaking cycle will not begin until the
icemaker
and
freezer
operating temperature, then icemaking will begin
automatically.
Installation Instructions
temperature control (refrigerator
and freezer) only.
compartment
reach
16

Publicidad

loading

Este manual también es adecuado para:

Gtl21Gtk21Gtz21