Friedrich VERT-I-PAK A Serie Manual De Instrucciones página 10

Ocultar thumbs Ver también para VERT-I-PAK A Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Figure 9
Plenum Installation
NOTE: Proper header and wall penetration must conform to all national and local building codes.
Proper
Caulking
Architectural louver VPAL2
mounted on the outside
wall plenum (Part A)
After the rough cut opening is prepared, you are ready to assemble the two wall plenum parts. Before
caulking and permanent attachment, dry fi t the outside plenum into the rough opening and check for fi t
and level. Caulk (silicone recommended ) the parts well and insert them into the wall as shown.
A) Apply caulk and insert Outside Part A into the hole.
B) Apply caulk and insert Inside Part B into Part A. Be sure that Part A does not back out of the wall hole.
8
Proper Header
Proper
Flashing
Inside Wall Plenum (Part B)
Install anchor screws approxima-
tely four inches from the top and
bottom of the plenum.
make penetration through the top
or bottom of the plenum
Outside
Proper Caulking
Wall
Proper Flashing
Caulk all 8 flange
corners and unused
holes
Do not

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vea24kVha24k

Tabla de contenido