Mains Connection - BH FITNESS H105 Instrucciones De Montaje Y Utilización

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 1
LEVELLING.
Once the unit has been placed into its
final position, make sure that it sits flat
on the floor and that it is level. This can
be achieved by screwing the adjustable
feet (7) up or down, as shown in Fig.8.
MOVEMENT & STORAGE
The unit is equipped with wheels (40)
to make it easier to move. The wheels
located at the front of your unit make it
easier to move it into a chosen
position, by lifting the rear of the unit up
slightly and pushing it, as shown in
Fig.9. Store your unit in a dry place,
preferably not subject to changes in
temperature.

MAINS CONNECTION

Transformer:
12 V- 1000 mAmp.
Insert the jack (g) on the transformer (c)
into the connection hole (h) on the main
body (A) (bottom, rear of the machine)
and then plug the transformer into a 220
V mains supply, Fig.10.
BH RESERVES THE RIGHT TO
MODIFY THE SPECIFICATIONS OF
ITS PRODUCTS WITHOUT PRIOR
NOTICE.
Do not hesitate to get touch with us if
you have any queries, by calling:
+44 0844 335 3988
service@bh-uk.co.uk
12

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

H106

Tabla de contenido