Descargar Imprimir esta página

Wolf CGB Instrucciones De Montaje página 3

Ocultar thumbs Ver también para CGB:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 7
Boiler installation
DHW cylinder flow/return
Bend -
heating
flow
Cap -
heating return
Three-way
diverter valve
PLEASE NOTE
Initial start-up
Vent - cylinder flow
Wolf GmbH · 84048 Mainburg · Postfach 1380 · Tel. 08751/74-0 · Fax 08751/741600·www.wolf-heiztechnik.de
3044712_0707
Installation instructions for the DHW cylinder
connection set for third party equipment
Install the wall mounted boiler in accordance with installation instructions.
- Remove the cap from the heating return.
- Remove the bend from the heating flow.
- Install the three-way diverter valve from the connection set with the enclosed
gaskets to the heating flow.
- Secure the DHW cylinder return pipe to the gas fired boiler with the flat packing.
- Secure the DHW cylinder flow pipe with flat gasket to the three-way diverter valve.
- All other pipework on site. Ensure the system is properly vented.
- Remove the dummy plug from the boiler control unit and connect the three-way
diverter valve.
- Connect the blue plug of the electronic DHW sensor with the blue socket on the
control unit.
- Insert the electronic DHW sensor into the DHW cylinder sensor well.
Only install the compression fittings with the enclosed support sleeves
Three-way
diverter valve
Gas fired boiler
Heating flow
Gas supply pipe
DHW flow
Whilst filling the heating system, carefully vent at the cylinder flow and return.
Fill the DHW cylinder.
Switch ON the boiler and set the required DHW temperature at the control unit.
CGB /
TGC
Air vent valve
DHW return
Air vent valve
DHW flow
Heating return
DHW return
3

Publicidad

loading

Este manual también es adecuado para:

Tgc