Installation Diagram - Atlas Filtri OASIS DP RO Instrucciones Para La Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 26
2.5 Production installation
Before installation, make sure the plumbing system has been installed as for the exhisting rules of the state of the art.
Install a bypass that permits unit's by-passing.
Install a check valve from the unit to the water mains.
For mains pressure over 8 bar (116 psi) a pressure reducer must be installed upstream from the product. Protect the
product against "water hammer" using an appropriate anti-water hammer system (expansion vessels, shock absorbers).
For mains pressure under 3 bar, install pump models (PUMP, PUMP-UV).
Presence and efficiency of the grounding of the power line.
Power line compatibility with the electrical specifications of booster pump (for PUMP models) and UV lamp (for UV models).
Power wires diameter over 1 mm.
Mains voltage stability (voltage peaks under 10%).

INSTALLATION DIAGRAM

1
Water supply
2
Processed water tap
3
Drain bracket
4
Storage tank tap
5
UV lamp power (optional)
6
Booster pump (optional)
2.5.1 Typical installation with 1/2" MF water intake
Unscrew the cold water hose nut from the wall coupling.
With sealing tape (PTFE), install the 1/2" MF water intake
with the 1/4" tap.
Reassemble the previously detached hose on the water intake male.
Connect the OASIS 1/4" hose to the water intake.
1
3
4
2
6
Water
supply
1/2"
Wall
coupling
|
7
OASIS DP RO
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Oasis dp sanic ro

Tabla de contenido