Installer La Boulonnerie De Fixation - Kohler K-5032 Guía De Instalación Y Cuidado

Lavabos de pedestal
Ocultar thumbs Ver también para K-5032:
Tabla de contenido

Publicidad

4.
Install the Mounting Hardware
1
Drill pilot holes at
the marked locations.
Percer des orifices de guide
sur les points indiqués.
Taladre un orificio guía
en los lugares marcados.
11"
(27.9 cm)
3
Verify bolts are level.
Vérifier que les boulons sont à niveau.
Verifique que los pernos estén a nivel.
For K-5026 / K-5149 Only:
Using the appropriate sized drill bit for your lag bolts, drill pilot holes at the two
outermost marked locations.
Using a 10 mm drill bit, drill pilot holes at the two innermost marked locations.
Install the anchors and hanger bolts in the two innermost holes.
For All Installations:
Using a 10 mm drill bit, drill pilot holes for the hanger bolts.
Install the anchors and hanger bolts.
Installer la boulonnerie de fixation
Pour K-5026 / K-5149 uniquement:
En utilisant le type de mèche de la taille correcte pour les tire-fonds, percer des
trous-pilotes aux deux emplacements extrèmes marqués.
Avec une mèche de 10 mm, percer les trous aux emplacements les plus à
l'intérieur.
Kohler Co.
2
Install the anchors and hanger bolts.
Installer les ancrages et les
boulons d'ancrage.
Instale los anclajes
y los pernos de sujeción.
Anchor/Ancrage/Anclaje
Hanger Bolt
Boulon d'ancrage
Perno de sujeción
Hanger Bolts
Boulons d'ancrage
Pernos de sujeción
11
1114336-2-A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-5149K-5152K-5026K-5027

Tabla de contenido