1. Install the central unit to the wall bracket.
2. Connect the central unit's RJ45 low voltage wire to the wall bracket's RJ45 low voltage terminal.
3. Plug in the power cord to the socket.
4. Check that the system works correctly by starting the central unit from a wall inlet (C.Axpir Initia).
5. C.Axpir Comfort commissioning
5A – C.Axpir Comfort user interface
5B – Checking the correct operation of C.Axpir Comfort wireless control
1. Connect the hose to a wall inlet valve (not to the service inlet valve integrated to the control unit).
2. Shake the hose lightly. Unit should start within 5s.
3. Press the button of the stop valve located on the handle.
4. If the start and stop are successful, the CVC unit is ready for use.
5. If this fails, refer to paragraph 5C.
START
INSTALLATION OF THE CVC UNITS
ON
ON button – Starts of the unit
OFF
OFF button – Stops of the unit
LED – Maintenance or piping leak alert
LED – Dust tank or dust bag full
EN
START
5 s
15