One of the most important procedures that will be
encountered in the base preparation is LEVELING
THE SEALER (SCREED). It must be PERFECTLY
LEVEL! If it is not, the wall panels will follow
the irregularities of the building floor which will
directly affect subsequent procedures such as panel
latching, panel gasket seal, ceiling panel assembly
and other.
After the outline of the sealer (screed) and the sealer
guide is completed, as shown in Figure 2, locate the
highest point within the outline on the floor where
16
- s
s
iTe
elecTion
2940 Hwy 14 W, Rochester, MN 55901
the screed (sealer) will be installed. (Sealer sections
are 4" wide). A transit or surveryor's level is an ideal
instrument for this purpose. Mark the highest point
on the floor as illustrated on Figure 3.