Palazzetti MULTIFIRE 45 ARIA Manual De Instalación Y Mantenimiento página 29

Ocultar thumbs Ver también para MULTIFIRE 45 ARIA:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

6.6 HOT AIR DELIVERY CONNECTION.
6.6.1 Protection hood connections for heating one
room
rotating it at the same time (Fig. 6.4.1).
Cut it to the desired length (not more than 200 cm)
and install the vents at the desired locations.
Attach the pipe (1) to the collars (3) with the clamps
(2) (Fig. 6.6.1).
Insulate the pipes with rock wool.
Fix the vents on the hood or wall at a height of at
least 1,8÷2,0 m from the ground to prevent hot air
from blowing on people.
It is not advisable to run ducts for over 2 m.
6.6.2 Duct connections for heating several rooms
To heat several rooms it is possible to install metal
air distribution ducts in accordance with the following
outline:
duct
is installed; the second duct may be used to convey
hot air to the other rooms in the house.
Alternatively, connect the hot air delivery by means
channels.
The air distribution ducts must have an internal cross
section of 20×20 cm, they must be constructed in
smooth galvanised sheet metal and insulated with a
30 mm sheet of rock wool as a protection from noise
and heat dispersion.
duct).
rooms, it is very important to promote air circulation
from one room to the other in order to obtain an even
doors or leave them ajar.
The drawing is just an indication on the air intake
and not an example of installation.
6.6.3 ARRANGEMENT OF PANELS
6.6.3.
The openings for inspection and pellet loading must
comply with the indicated measures.
INSTALLATION
A
Fig. 6.6.2 A
004775230 12/2016
1
2
3
Fig. 6.6.1
B
Fig. 6.6.2.B
Fig. 6.6.3
29

Publicidad

Tabla de contenido
loading

Tabla de contenido