Bradley EFX 60 Manual De Instalación página 4

Válvula mezcladora termostática con armario opcional
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

EFX 60/S19-2200
2
Connect Supply Lines and Install Thermometer
When the check valves are in the
open (opera ting) position, the cover
screw for the stop/check stem will
be flush with the valve cap.
Install Thermometer using pipe
sealant or teflon tape.
Check for leaks by pressurizing
unit SLOWLY.
3
Adjust Temperature with Water Running
Check the temperature when approximately 10 GPM
water flow is reached (equivalent to two face washes)
This device must be checked for final temperature and adjusted as
necessary. The standard preset factory temperature setting is 85°F
(29°C). [the range of the valve is 65°F – 95°F (18°C – 35°C)]. Consult
proper medical and/or safety authorities for the optimum temperature
recommended for your particular application.
4
Test Unit
Shut the hot water supply off by closing hot water inlet valve or supply check valve. While the hot water supply is turned off,
check to make sure the cold water continues to flow. If the cold water is flowing properly, reopen the hot water supply.
Shut the cold water supply off by closing the cold water inlet valve or supply check valve. While the cold water supply is off,
check to make sure that the hot water flow has shut down. If hot water is shut down, reopen cold water supply. Test unit
weekly for proper function and desired set temperature.
4
Check
Stop Nut
Thermometer
DO NOT SKIP THIS STEP!!!
4/15/2013
Tempered Water
(to Fixture)
HOT
5/32" Allen Wrench
Temperature Set
Screw
Bradley • 215-1289 Rev. M; ECN 13-09-006
Installation
Slotted Cover
Screw
Stop/Check
Cover Screw
Water Recirculation
Plug
COLD
Slotted Cover
Screw
H
C

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

S19-2200Efx60Efx60pEfx60rs

Tabla de contenido