CP 1210, CP 1260, CP 1290
Assembly instructions
Reasonable care must be taken during assembly and
disassembly of the tool to avoid burring, scoring or
distortion of closely fitting precision built parts.
1. Check all metal to metal surfaces for nicks and
burrs before and during assembly.
2. Before re-assembly, lubricate all O-rings and coat
all moving parts of tool with recommended
lubricants.
3. During assembly, take care to keep dirt out of
tool, particularly between mating surfaces.
4. The front head bolts should be tightened so that
the buffers or springs are evenly compressed to
the assembled length given in section
"Tightening torques".
5. When assembly is complete pour about ½ oz.
(1.5 cl) of the recommended oil into the air inlet
and operate the pneumatic breaker at reduced
throttle for 10–15 seconds. When operating the
pneumatic breaker on the floor, do so at reduced
throttle to avoid damage to piston, anvil block
and front head.
9800 1351 90 | Original instructions
www.CrowderSupply.com • Toll Free: 888-883-5144
Safety and operating instructions
6. Install the spring pins with the slots in opposite
directions and at the 45 degrees angle. See
illustration below (only valid for CP 1210 - all
versions).
45°
CP 1210
Install the spring pins with the slots in upward
positions. See illustration below (valid for CP
1210 SVR, CP 1260 SVR and CP 1290 SVR).
CP 1210 SVR, CP 1260 SVR and CP 1290 SVR
19