52
E
mbedding box positioning.
1650
Make a hole on the wall in order to place the upper part of the door panel at 1,65m height.
The hole dimensions will depend on the number of door panel modules.
Modules
Model
W
H
D
The door panel has been designed to stand diverse environmental conditions. Nevertheless,
it is advisable to take additional precautions in order to extend its life (such as visors,
covered places ...).
DOOR PANEL INSTALLATION
1
Compact
CE610
CE615
125
140
56
Break the bottom flange to pass the cables through it. If the door panel
has more than one embedding box, break the side flanges to
wire the modules and join the embedding boxes by means of the
UC junctions.
1850
1450
2
CE620
125
125
257
220
56
56
P
3
CE630
125 mm.
374 mm.
56 mm.
reparing the cables entry.