Setting Up The System - sewerin HP 105 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 19
4

Setting up the system

Follow the instructions in the specified order.
1. Connect the pressure regulator to the fuel gas bottle by hand.
2. Screw the pressure hose to the pressure regulator.
3. Flush the pressure hose to remove any residual air.
a) Open the valve on the fuel gas bottle.
b) Press the non-return valve on the pressure hose for a short
time.
c) Close the valve on the fuel gas bottle once more.
4. Connect the pressure hose to the fuel gas connector on the
device.
5. Switch on the device.
6. Open the valve on the fuel gas bottle slowly.
7. Wait until the device shows the zero point (0 ppm, value stops
flashing).
8. If necessary (section 5):
● Adjust the pressure on the pressure regulator.
English │ 13

Publicidad

Tabla de contenido
loading

Tabla de contenido