Installation Instructions - Bradley S19-310SPR Manual De Instalación

Combinación de ducha de aspersión y lavador de ojos/rostro
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Installation
Supplies Required:
• (3) 3/8" floor anchors and bolts
• Teflon tape and pipe sealant
• Piping to 1-1/4" NPT water supply inlet and 1¼" NPT
drain outlet on unit
• Adequate supply pipe supports
• Minimum 4" (102mm) drain to accommodate 30 gallons
(115 liters) per minute discharge for shower waste
• OPTIONAL: sign-mounting hardware
Local codes may require the installation of a backflow
prevention valve to complete proper installation.
Compliance with local codes is the responsibility of the
installer. Valve must be tested annually to verify that it
is functioning properly. Backflow prevention valves are
not included with the fixture and may be supplied by
the contractor or purchased from Bradley Corporation.
Step 1: Secure base to floor
1. Install three suitable anchors (supplied by installer) for
3⁄8" bolts in the floor.
2. Bolt the base to the floor anchors using 3⁄8" bolts
(supplied by installer).
Step 2: Assemble components
1. Assemble the remaining unit components as shown on
page 4.
• Apply pipe sealant (by installer) to all male-
threaded pipe joints.
• Use the rubber grip pad provided or a strap wrench
around pipes when tightening to prevent marring.
Place the grip pad on the pipe, then put the
wrench over the grip pad and turn the pipe with the
wrench.
• When connecting the steel chain, first connect the
chain to the "S" hook on the foot treadle. Then, with
the foot treadle raised up, straighten the chain and
connect a link to the "S" hook on the valve handle.
Make sure the chain is pulled tight. The length of
chain will vary.
• Bottom edge of the showerhead should be 84-5⁄8"
(2149mm) from floor.
Step 3: Connect water supply
IMPORTANT! Do not rely on Bradley's Combination Unit
to support supply piping.
1. Connect water supply piping to 1¼" NPT inlet on unit
(piping by installer). Provide adequate supports (by
installer) for supply pipe using pipe hangers or other
means.
2. Connect drain piping to 1¼" NPT drain outlet on unit
(piping by installer).
3. Hang the safety sign from the unit with the curtain hooks
provided (or mount it to the wall using sign-mounting
hardware by installer).
Bradley • 215-163SPR Rev. P; ECN 12-05-013A
25-3⁄8"
6"
(645mm)
(152mm)
84-5⁄8"
(2149mm)
to Bottom
of Base
68"
(1727mm)
to Bottom
of Base
42-3/8"
(1076mm)
to Bottom
of Base
6"
(152mm)
Top View
From Bowl
Ø 10-3/4"
(273mm)
10-1/2"
(267mm)
All dimensions assume standard thread
engagement. Variations in manufacturing
allow for +/-
" (3mm) per threaded joint.
1
8
To find the tolerance of a dimension, add
the number of thread joints in between a
dimension and multiply it by
12/07/2012
S19-310SPR
94-1⁄8"
(2391mm)
to Bottom
of Base
65-3/4"
(1670mm)
to Bottom
of Base
31"
(787mm)
to Bottom
of Base
9-1/2"
(241mm)
Ø 9" (229mm)
Flange with (3)
Ø 3⁄8" (10mm)
Holes on Ø 8"
(203mm) Bolt
Circle
" (3mm).
1
8
3

Publicidad

Tabla de contenido
loading

Tabla de contenido