MateriaRs
Needed
. ¼" outer diameter flexible copper tubing
. Shut-off valve (requires a '/4" hole to be drilled into
water supply line before valve attachmen0
. Adjustable
wrench
. '/_" hex nut driver
. Add 8' to tubing
length needed to reach water
supply for creation of service loop.
1. Create service loop with copper
tubing
(minimum
2' diamete0.
Avoid kinks in the copper tubing
when bending the service loop.
2. Remove plastic cap from water valve
inlet porL
3_ Place brass nut (A} and
sleeve (B} on copper
tube end as illustrated,
(Do not use old sleeve.}
A
4_ Place end of copper tubing
into water
valve inlet port. Shape tubing slightly. Do
not kink - so that tubing feeds straight
into inlet port.
5. Slide brass nut over sleeve and screw nut
into inlet port. Tighten nut with wrench.
U MPORTANT:
Do not overtighten.
Cross
threading
may occur`
.
Pull on tubing to confirm
connection
is
secure. Connect tubing
to frame with
water tubing
clamp (C} and turn on
water supply. Check for leaks and
correct if necessary. Continue to
observe the water supply connection
for two to three hours prior to moving
the refrigerator
to its permanent
location.
7. Monitor water connection
for 24 hours.
Correct leaks, if necessary.
Handme installation
If not installed, the handle is located in the interior of
the fresh food section or attached to the back of your
refrigerator,
Remove and discard handle packaging
and tape.
Handle design varies from refrigerator
to refrigerator.
Please reference the appropriate
instructions
for your
model below.
Front Mount
Handle
Materials
Needed
Gloves to protect hands
• Phillips screwdriver
• Plastic door removal card (or %" thick plastic card},
retain the card
To UnstaH:
The handles are to be oriented
as shown.
Align front mount door handle
clip with the door tabs.
Ensure the handle clips are
positioned
slightly above the
door tabs.
Door
Tab
4. Rotate the handle so that the
handle is flat against the door.
5. Push the handle down against the
upper door tab just enough to allow
it to hang unsupported.