Weber Summit 56070 Manual De Instalación página 8

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

8
BUILT-IN GAS LINE LOCATIONS
GENERAL CONSTRUCTION DETAILS
®
Summit
Built-In Side Burner unit should be on site before construction begins.
Provide access for a corrugated gas line depending on the location of the side
burner in relation to your main gas supply and regulator position.
Area should be kept clear of sharp, jagged, or extremely abrasive surfaces to
avoid possible damage to gas supply lines. Exercise caution when pulling gas lines
through built-in structure.
A 3/8 inch (9.52 mm) stainless steel corrugated gas line (NOT INCLUDED) should
be used to connect the side burner to the bulkhead accessory coupling.
CAUTION: 3/8 inch (9.52 mm) stainless steel corrugated gas
line must not exceed 58 inches (147 cm) in length. A longer
hose could cause an improper pressure drop.
WARNING: Do not use a rubber gas hose.
MOUNTING THE SIDE BURNER
1)
Attach the mounting bracket(a) to the outside rear of the Side Burner box. Secure
with locking washers and wing nuts. Hand-tighten only.
2)
Insert bushing(b) into hole at rear/left side of Side Burner box until it snaps into
place.
3)
Route the 3/8 inch (9.52 mm) stainless steel corrugated gas line through the hole
in the left side of the Side Burner box(c). Pass the supply end of the hose to the
gas supply enclosure (see "CONNECT GAS SUPPLY" section).
CAUTION: Before installing component, remove protective
film from the stainless steel part.
4)
Lower the Side Burner box into the Side Burner cut out.
5)
Secure the Side Burner box with a non corrosive screw(d) anchored into the
finished surface of the "island structure" .
INSTALLATION
1
3/8" (9.52 cm) Stainless Corrugated Gas Line (58" Max. Length)
2
a
b
1
2
GAS LINE LOCATIONS
Gas Supply Enclosure Location
d
WWW.WEBER.COM
c
®

Publicidad

Tabla de contenido
loading

Tabla de contenido