Installation Instructions
This appendix describes the installation requirements,
installation procedures and checks.
i. Installation requirements.
Space requirements.
The drawings show the minimum requirements from
a safety viewpoint.
Refer to drawing i-1 for space requirements.
Each drawing has 2 sets of dimensions:
1 from the walls to the center of the holes (on the
left and top of the drawing);
2 from the walls to the side of the cabinet (on the
right and bottom of the drawing).
Floor requirements.
The floor should be:
-
horizontal; within 2°
-
level; within 2 mm
-
able to bear the weight of the balancer as stated
in Chapter 2 of the Operator's Manual.
The floor on which the balancer will be installed
should not relay vibrations from other devices or
from outside the building. External vibrations will
affect the accuracy of the balancer.
Note:
The balancer should be positioned on the
floor directly. Do not use shims to fill gaps.
If the above conditions are met, you do not need to
secure the balancer to the floor, however if for op-
timal performance balancer should be lagged to the
floor to prevent any accidental vibrations or move-
ment.
Power supply requirements.
Refer to Chapter 2 of the Operator's Manual for mains
power requirements.
WARNING: ENSURE THAT AN APPROVED WALL
MAINS OUTLET IS AVAILABLE.
WARNING: NEVER LAY POWER SUPPLY CABLES
OVER THE FLOOR, UNLESS PROTECTED BY
AN APPROVED COVER.
Operator's Manual