Kohler 528-K Guia De Instalacion página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Outlet
Power
Cord
Outlets
Supply Inlets
2. Plan the Component Locations
NOTICE: If the valve will be used for a bath/shower application, the bath fill supply line must be routed
from the #1 outlet port.
NOTE: Your interface may appear different than the one illustrated, however, the installation procedure
for the valve remains the same. For the interface installation, please follow the instructions packed with
the interface.
Determine the locations of all required components before beginning installation.
When routing piping, the numbers marked at each valve outlet must correspond to the appropriate
shower fitting for preprogrammed or custom showering experiences to function properly.
Kohler Co.
Interface
Drip
Loop
7
NOTE: Only one interface, installed
inside the shower, is required.
Drip Loop
20' (6.1 m) Cables
Interface
Coupler
1145587-2-D

Publicidad

Tabla de contenido
loading

Tabla de contenido