vitapur VUV-S375B Instrucciones De Instalación Y Manual Del Propietario página 10

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

P
rocedure for
• Turn off the water supply at both ends of the system.
• Unplug the unit.
• Drain water from the Stainless Steel UV Chamber.
• Allow at least 5 minutes for lamp to cool.
• Remove the connector from the end of the UV lamp.
• Remove the UV lamp from the quartz sleeve by gently rotating the lamp free. Be sure to hold the lamp only
by the ceramic tips.
• Remove the retaining nut securing the quartz sleeve into the chamber
• Remove the quartz sleeve sealing O-ring
• Remove the quartz sleeve and clean as noted above.
• Insert quartz sleeve into the UV chamber. Quartz sleeves should be replaced every 3 years for optimal
performance
• Insert UV lamp into the quartz sleeve and attach the connector.
• Slowly refill the UV chamber by opening the water supply just enough to fill the chamber with water.
• Check the system for leaks.
• Apply power to the UV system
• Ensure that the UV lamp is operating by verifying ballast green LED indicator is on and display is operational
If your system is only being used seasonally, it must be stored properly for the winter. Disconnect your system
from the power source and drain all water from the system.
Before placing the system back in service, disinfection of the household plumbing system is strongly
recommended.
r
/ I
emovIng
nStallIng tHe
Q
S
uartz
leeve
:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vuv-s645bVuv-h375bVuv-h645b

Tabla de contenido