Installation And Start Up - Vestfrost VLS 024 SDD Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 30

Installation and start up

Connect the appliance to the solar pan-
els according to table 1, which states the
lengths and sizes of the wires used for con-
necting the appliances.
Standard supplied cable size and length will
²
be 6mm
and 20m.
The thick doublet wire (Blue & red) from
the solar panel must be inserted into the
compressor compartment via the hole on
the back – See fig. 5
The Red Wire (+) (the opposite side of the
terminal is also red) and the Blue wire (-)
(the opposite side of the terminal is black)
has to be connected to the terminal. –
Clean the appliance thoroughly before start
up.
Start up
Before the appliance is loaded with vaccine,
the ice pack ballast must be frozen. The
cool-down time in an ambient temperature
of 43°C will be approx. 5-7 days.
When the temperature on the display of
the thermometer is approx. +4°C in the
morning, the appliance is ready for load-
ing vaccine. Check the temperature in the
basket. The temperature must be between
+2°C and +8°C.
The vaccines must be placed and arranged
as shown Fig 8
The temperature in the vaccine compart-
ment must always be monitored on the ther-
mometer and be between +2°C and +8°C.
The controller is factory set and should not
be adjusted by unauthorized personnel.
Size:
Cross section
[mm2]
2,5
4
6
10
Table 1
VLS 054A / 094A / 154A SDD
VLS 024 SDD
7
Max. length:
AWG
[Gauge]
[m]
12
8
12
13
10
20
8
32
Blue wire
Red wire
GB
[ft]
26
42
65
105
A
B
fig. 5
fig. 6

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vls 054a sddVls 094a sddVls 154a sdd

Tabla de contenido