PRE-OPERATION CHECK
BREAK-IN
During the engine break-in period, observe the following by all means:
1. Change engine oil and oil filter cartridge after the first 50 hours of operation. (See "ENGINE OIL" in "PERIODIC
SERVICE" section.)
2. When ambient temperature is low, operate the machine after the engine has been completely warmed up.
DAILY CHECK
To prevent trouble from occurring, it is important to know the conditions of the engine well. Check it before starting.
To avoid personal injury:
A Be sure to install shields and safeguards attached to the engine when operating.
A Stop the engine at a flat and wide space when checking.
A Keep dust or fuel away from the battery, wiring, muffler and engine to prevent a fire.
Check and clear them before operating everyday. Pay attention to the heat of the
exhaust pipe or exhaust gas so that it can not ignite trash.
1. Parts which had trouble in previous operation
2. By walking around the machine
3. By inserting the key into the
starter switch
4. By starting the engine
Item
(1) Oil or water leaks
(2) Engine oil level and contamination
(3) Amount of fuel
(4) Amount of coolant
(5) Dust in air cleaner
(6) Damaged parts and loosened bolts and nuts
(1) Proper functions of meters and pilot lamps; no stains on
these parts
(2) Proper function of glow lamp timer
(1) Color of exhaust fumes
(2) Unusual engine noise
(3) Engine start-up condition
(4) Slow-down and acceleration behavior
PRE-OPERATION CHECK
Ref. page
14 to 16
3
-
14
12
16
19
-
-
-
7
7
5
7