Install additional rows of master units:
• Start a second row by moving a master unit in front of
the left master unit in the back row with a gap of about 8'
[2.44m] between it and the corner master unit, with the
safety lock and the foot levers facing the stage front.
• Adjust the pin connectors according the layout in the
manner described above, making sure the spring loaded
pin (C) is fully engaged and the decks are secured again
by retightening the adjustment screws (F). (See page 7)
• Install a bridge deck onto the pin connectors at the back
end of this master unit and the front end of the master
unit in the corner. Secure the deck in place by tightening
the adjustments screws (F) in the pin connectors. (See
page 7)
• Install a second bridge deck between the ends of these
two master units and secure it to the pin
connectors.
• Add a second master unit to this row, connecting it to the
first master unit of this row with bridge bars.
• Install a bridge deck on pin connectors of these two
master units (i.e., above the bridge bars). Secure the
deck.
• Install three bridge decks between the row two master
units and the row one master units. Secure the decks.
• Add master units to complete the row of master units,
connecting then to the other master units with either
bridge bars or side to side connectors. Adjust pin
connectors as required and install bridge decks, making
sure to secure the decks and that pin connector spring
loaded pins engage the sockets.
• Add additional rows of master units and bridge decks
to complete the stage setup. If bridge decks are not
required between the ends of two rows of master units,
end to end connectors must be installed to keep the two
rows from separating from each other. Failure to do so
could allow a gap to form between adjacent decks. Just
place one of these over the 2"x6" [5cm x 15cm] frame
members of the adjacent master units.
MOVE STAGE SYSTEM
Move the entire stage system to the desired location. Then,
lower the master units onto their legs, starting with the
master unit in one corner and working your way toward the
opposite corner.
First (Rear Row)
1
1 1
2
4
2
2 2
8 ft. (2.4m)
Second Row
4
2
2 2
4
2
2 2
Foot levers & safety lock
End To End Connector
2
1 1
4
2 2
Approx.
4
2 2
4
2 2
2
4
4
4
Page 10