Installation; Pre-Installation Inspection - ALLIANCE JC50CG Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Pre-Installation Inspection

Upon delivery, visually inspect the packaging and
portions of the product visible through the packaging
for shipping damage. If the package or product is
damaged, or if signs of possible damage are evident,
have the carrier note the condition on the shipping
papers before the shipping receipt is signed, or advise
the carrier of the condition as soon as it is discovered.
Remove the packaging as soon as possible and check
the items listed on the packing list. Advise the carrier
of any damaged or missing articles as soon as possible.
A written claim should be filed with the carrier
immediately if articles are damaged or missing.
IMPORTANT: Remove the shipping tape from the
two backdraft dampers located in the exhaust
outlet.
IMPORTANT: Warranty is void unless tumbler is
installed according to instructions in this manual.
Installation should comply with minimum
specifications and requirements detailed in this
manual and with applicable local gas fitting
regulations, municipal building codes, water supply
regulations, electrical wiring regulations, and any
other relevant statutory regulations. Due to varied
requirements, applicable local codes should be
thoroughly understood and all pre-installation
work arranged for accordingly.
70268201

Installation

© Published by permission of the copyright owner – DO NOT COPY or TRANSMIT
Materials Required (Obtain Locally)
One fused disconnect switch or circuit
All Models
breaker.
One gas shut-off valve for gas service
Gas Models
line to each tumbler.
Steam Models One steam shut-off valve for steam
service line to be connected upstream of
solenoid steam valve.
Two steam shut-off valves for each
condensate return line.
Flexible steam hoses with a 125 psig
(pounds per square inch gauge)
(8.79 kg/sq. cm) working pressure for
connecting steam coils. Refer to
Figure 15 for sizing and connection
configurations.
Two steam traps for steam coil outlet to
condensate return line.
Two vacuum breakers for condensate
return lines.
IMPORTANT: Keep tumbler area clear and free
from combustible materials, gasoline and other
flammable vapors and liquids.
17

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido