Altrex Scaffold trailer Manual De Instrucciones página 19

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 22
Loading the trailer with Safe-Quick® 2 Guardrail
After fitting the mounting frames, hang the first Safe-Quick® Guardrail with the arms facing upwards and the claws inwards.
Hang the next Safe-Quick® Guardrails alternately. Then secure the equipment with a lashing strap.
The image above shows the maximum load (rolling tower width, 13.20 m working height with Safe-Quick®). When configu-
rations with fewer parts are being transported ensure that the trailer is loaded as symmetrically as possible for optimal road
grip.
1.
2.
A
B
6.
5.
C
D
1
4.
3.
1.
Assembly frames
2.
Safe-Quick® Guardrails
3.
Platforms
4.
Braces
5.
Triangle stabilisers
6.
Toe boards
1
For 2 platforms, use the lower space.
For 4 platforms, use the upper space.
For 6 platforms, use all the spaces.
2
2
19
www.altrex.com
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido